Key Takeaways:
- A 30-yard dumpster holds approximately 9-12 pickup truck loads and works best for mid-to-large residential construction projects with mixed, lighter debris
- These containers typically accommodate 4-6 tons (8,000-12,000 pounds) of material, making them ideal for framing, interior demolition, and multi-room renovations
- Weight capacity matters more than volume for construction work—dense materials like concrete or masonry quickly exceed limits even when the container looks half-empty
- General contractors save money by matching debris type to container size rather than defaulting to the largest option available
- Proper planning around project phases, material segregation, and waste stream timing determines whether a 30-yard size delivers the best value for your construction job
Article Summary:
Choosing a 30 yard dumpster for construction makes sense when your residential project generates 4-6 tons of mixed, lighter debris from framing, interior demolition, roofing tear-offs, or multi-room renovations. General contractors working in Peoria neighborhoods benefit from this size because it balances substantial capacity with a manageable 22-foot footprint that fits most driveways and job sites without requiring street permits.
Understanding 30-Yard Dumpster Capacity and Specifications
A 30-yard roll-off dumpster represents the most popular container size for typical residential construction projects throughout Peoria and surrounding Woodford, Tazewell, and Fulton County areas. These containers measure approximately 22 feet long, 7.5-8 feet wide, and 6 feet high[1]. The “30-yard” designation refers to cubic volume capacity, not weight limits or physical dimensions.
Think of capacity this way: if you filled a space 3 feet by 3 feet by 3 feet, you’d have one cubic yard. A 30-yard container holds thirty of those cubes, translating to roughly 9-12 pickup truck loads depending on how tightly you pack the debris[2]. For general contractors managing residential builds or renovations, this volume accommodates substantial waste without overwhelming smaller Peoria properties.
The weight capacity typically ranges from 4-6 tons (8,000-12,000 pounds) for standard residential construction debris[3]. This weight allowance proves critical for contractors because volume and weight don’t always align. You might fill only half the container’s volume but exceed weight limits if you’re disposing of dense materials like tile, concrete, or masonry.
Most 30-yard containers feature a rear door that swings open, making it easier to walk wheelbarrows or carts directly into the bin. This access point saves time on residential job sites where you’re clearing multiple rooms or handling bulky materials like cabinets, doors, or framing lumber.
How Volume Translates to Real Construction Debris
General contractors working on Peoria residential projects generate predictable debris volumes based on construction phases. A complete kitchen gut including cabinets, countertops, flooring, and drywall typically produces 6-8 cubic yards of waste. A full bathroom demolition with fixtures, tile, and framing generates 4-5 cubic yards. When you’re managing a whole-home interior renovation removing walls, flooring, and fixtures from multiple rooms, debris volumes quickly reach the 20-30 cubic yard range.
Framing waste from new residential construction or additions creates lighter but bulkier debris. Lumber cutoffs, packaging materials, drywall scraps, and insulation occupy significant volume but usually stay well within the 4-6 ton weight capacity. This makes the 30-yard size particularly efficient for framing contractors who need space more than weight capacity.
Why Dimensions Matter for Peoria Job Sites
The 22-foot length and 8-foot width fit comfortably in most Peoria residential driveways without extending into the street. This placement keeps your container on private property, eliminating the need for City of Peoria right-of-way permits that cost $20 per 30-day period[4]. For general contractors juggling multiple residential projects across Peoria neighborhoods, avoiding permit delays and fees streamlines your scheduling.
You need approximately 60 feet of clear, straight space for delivery and pickup because the roll-off truck requires room to maneuver and safely place the container. The delivery area also needs 23-25 feet of vertical clearance for the truck’s hydraulic lift system to function properly.
Quick Decision Table: Is 30-Yard Right for Your Construction Project?
| Project Type | 30-Yard Works Well | Consider Different Size |
|---|---|---|
| Framing Package | ✓ Standard residential (1,500-2,500 sq ft) | Custom home over 3,000 sq ft (upgrade to 40-yard) |
| Interior Demolition | ✓ Multi-room gut, drywall removal | Single bathroom (downsize to 20-yard) |
| Roofing Tear-Off | ✓ Single-layer asphalt (1,800-2,200 sq ft) | Multi-layer or tile roof (downsize to 10-yard for weight) |
| Foundation Work | Form boards, packaging, light debris | Concrete breakup (downsize to 10-yard) |
| Siding Replacement | ✓ Full vinyl or wood siding removal | Partial repair (downsize to 20-yard) |
Project Types Where 30-Yard Containers Excel
General contractors working on residential construction projects face a critical sizing decision early in the planning phase. The 30-yard container shines in specific construction scenarios where debris characteristics match the container’s capacity profile. Understanding these ideal applications helps you avoid the common mistake of either overpaying for unused capacity or scrambling to arrange additional pickups when you’ve underestimated volume.
New Residential Construction and Additions
When you’re building a standard single-family home in Peoria (typically 1,500-2,500 square feet), the 30-yard container handles framing waste, packaging materials, and general construction debris efficiently. New construction generates predictable waste streams: lumber cutoffs from framing, cardboard and plastic packaging from windows and doors, drywall scraps, insulation remnants, and miscellaneous hardware packaging.
These materials share important characteristics—they’re relatively lightweight but occupy significant volume. A 30-yard container provides the space you need without risking weight overages. For home additions ranging from 400-800 square feet, this size accommodates the entire build cycle from foundation prep through final trim work.
Residential additions work particularly well with 30-yard containers because you’re generating fresh construction debris rather than dealing with demolition materials that tend to be denser and heavier.
Multi-Room Interior Renovations
Whole-home remodels or multi-room renovations represent the sweet spot for 30-yard containers. When you’re gutting and rebuilding kitchens, bathrooms, and living spaces simultaneously, debris accumulates rapidly. The container capacity matches the typical waste volume from removing old cabinets, countertops, flooring, drywall, and fixtures from 2-3 rooms.
Kitchen renovations alone generate substantial debris. Standard cabinet removal produces 8-12 cabinet boxes plus countertops. Add flooring removal (typically 150-200 square feet in a Peoria-area kitchen), drywall work, and old appliances, and you’re approaching 8-10 cubic yards just from the kitchen. Combine this with a master bathroom gut (4-5 cubic yards) and living room updates, and the 30-yard size provides appropriate capacity.
For contractors managing phased renovations where homeowners remain in the residence, the 30-yard container offers enough capacity to keep the project moving without requiring frequent swaps that disrupt the neighborhood or complicate scheduling.
Roofing Tear-Offs and Re-Roofing Projects
Single-layer asphalt shingle removal from residential homes presents an ideal application for 30-yard containers—with important caveats about weight. A typical 2,000-square-foot roof with one layer of asphalt shingles weighs approximately 4,000-5,000 pounds once removed, comfortably within the 4-6 ton capacity range[5].
The debris volume from this size roof fills roughly half a 30-yard container, leaving room for related materials like underlayment, flashing, drip edge, and packaging from new shingles. This balanced use of volume and weight makes economic sense for roofing contractors.
However, if you’re removing multiple layers of shingles or working with tile or slate roofing, the weight equation changes dramatically. Multi-layer shingle removal or tile roofing projects should use smaller containers (10-15 yard) to avoid exceeding weight limits even though the volume might not fill the container.
Waste sourcing solutions in Peoria help contractors match container size to specific roofing projects based on actual material calculations rather than guesswork.
Light Demolition and Selective Teardown
When you’re removing non-structural interior walls, tearing out old decks, or demolishing detached garages, the 30-yard container handles the job efficiently. Light demolition refers to projects where you’re not dealing with concrete foundations, heavy masonry, or structural steel—just wood framing, drywall, siding, and similar lighter materials.
A typical single-car detached garage demolition (12×20 feet) generates approximately 15-20 cubic yards of debris including framing lumber, roof sheathing, siding, doors, and windows. The 30-yard container provides adequate capacity while keeping the debris well within weight limits because wood-framed structures produce relatively light waste.
Interior wall removal during home renovations creates similar debris characteristics. Removing 2×4 framing, drywall, insulation, and electrical boxes produces bulky but lightweight waste that fills volume before approaching weight limits.
When 30-Yard Is the Wrong Choice for Your Construction Project
General contractors improve profitability by recognizing when a 30-yard container creates problems rather than solving them. Understanding these scenarios prevents overage fees, project delays, and unnecessarily high disposal costs that eat into your margins on Peoria residential projects.
Heavy Materials That Exceed Weight Limits
Concrete, brick, block, tile, and stone quickly overwhelm the weight capacity of 30-yard containers even when you’ve barely filled the volume. One cubic yard of concrete weighs approximately 4,000 pounds[6]. If you load just 3 cubic yards of concrete into a 30-yard container (using only 10% of the volume), you’ve already reached 12,000 pounds—the upper limit of most weight allowances.
For foundation work involving concrete breakup, driveway removal, or masonry demolition, contractors should use 10-yard containers and plan for multiple pickups. Though this seems inefficient, you’ll avoid overweight fees that typically run $50-100 per ton over the limit. Three 10-yard containers properly managed cost less than one overweight 30-yard container after fees and potential safety violations.
Tile removal presents a similar challenge. Ceramic or porcelain floor tile with mortar backing weighs 8-12 pounds per square foot. Removing tile from a 1,000-square-foot main floor can generate 8,000-12,000 pounds of material, filling weight capacity in a 30-yard container before you’ve used even a quarter of the volume.
Single-Room Projects With Limited Scope
Using a 30-yard container for a single bathroom remodel or kitchen-only project wastes money unless you’re coordinating debris from multiple job sites. A standard bathroom gut generates 4-5 cubic yards of waste. Renting a 30-yard container means you’re paying for 25 unused cubic yards.
General contractors working on single-room renovations in Peoria neighborhoods should right-size containers to actual project scope, using 10-15 yard containers for bathrooms and 15-20 yard sizes for kitchens.
The only exception occurs when you’re managing multiple small projects simultaneously and can consolidate debris from several job sites into one container. Some contractors coordinate 2-3 bathroom renovations across different properties, timing the work to share a single 30-yard container and reduce per-project disposal costs.
Projects With Extended Timelines
Construction projects extending beyond 7-10 days may benefit from smaller containers with scheduled swaps rather than one large container sitting on site. A 30-yard container on a residential driveway for 3-4 weeks creates neighborhood complaints, increases theft risk, and potentially violates local ordinances in some Peoria subdivisions.
For contractors managing complex renovations with multi-week timelines, using 20-yard containers with planned exchanges at logical project milestones (demolition phase complete, framing phase complete, etc.) often works better. This approach keeps the job site cleaner, reduces theft opportunities, and maintains better neighborhood relations.
Critical Factors in Choosing Between Container Sizes
The decision between a 20-yard, 30-yard, or 40-yard container depends on specific project variables beyond simple volume estimates. General contractors who consistently choose the right size on the first try understand how these factors interact.
Debris Weight and Density Calculations
Start every project by estimating debris weight, not just volume. Create a simple calculation: estimate the square footage of materials you’re removing, multiply by known weight-per-square-foot figures, then compare the total to container weight limits.
Common construction material weights:
– Drywall: 1.5-2 pounds per square foot
– Asphalt shingles: 2.5-3 pounds per square foot
– Hardwood flooring: 2.5-4 pounds per square foot
– Kitchen cabinets: 8-15 pounds per linear foot
If your weight calculation approaches or exceeds 4 tons (8,000 pounds), you’re at risk of overages in a standard 30-yard container. Either reduce the debris going into the container by separating materials or choose a smaller container size to avoid overweight fees.
Job Site Access and Placement Constraints
Peoria’s older neighborhoods often feature narrow driveways, mature trees with low-hanging branches, or overhead utility lines that limit container size options. Before committing to a 30-yard container, verify these measurements:
– **Straight-line clearance:** 60 feet minimum from street to placement spot
– **Width clearance:** 10-12 feet for truck positioning
– **Overhead clearance:** 23-25 feet for hydraulic lift operation
– **Driveway condition:** Stable surface that supports 20+ tons (loaded truck weight)
If any measurement falls short, you may need to place the container in the street (requiring a permit) or choose a smaller size that fits available space. Delivery space requirements for 30-yard containers deserve careful attention during project planning to avoid last-minute placement problems.
Project Phase and Timing Considerations
Construction projects generate different waste streams during different phases. Smart contractors match container size and timing to these natural project rhythms.
During demolition and teardown phases, debris accumulates rapidly. A 30-yard container works well here because you’re clearing everything out in a concentrated period. During the framing and rough-in phase, waste generation slows but continues steadily—lumber cutoffs, packaging materials, and miscellaneous debris. A smaller container with a longer rental period often makes more sense.
Finish work generates minimal debris. Using a 30-yard container during trim, painting, and final punch-list work wastes money. Consider using smaller containers (10-15 yards) or coordinating debris with other active job sites.
Container Size Comparison: Making the Right Choice
| Container Size | Typical Weight Limit | Best Construction Use | Peoria Price Range |
|---|---|---|---|
| 10-Yard | 2-3 tons (up to 10 for heavy materials) | Concrete, tile, roofing (multi-layer) | $350-500 |
| 20-Yard | 3-5 tons | Single-room reno, small additions | $400-600 |
| 30-Yard | 4-6 tons | Multi-room reno, framing, light demo | $500-750 |
| 40-Yard | 5-8 tons | Whole-home gut, large new construction | $600-900 |
Note: Prices reflect typical Peoria-area ranges for standard rental periods (7-10 days) and may vary based on debris type, haul distance, and disposal fees. Always request specific quotes for your project.
Cost Optimization Strategies for General Contractors
Managing waste disposal costs directly affects your bottom line on residential construction projects. General contractors working in competitive Peoria markets need strategies that balance convenience, capacity, and cost-effectiveness.
Understanding Inclusive Weight Allowances and Overage Fees
Most dumpster rental pricing includes a base weight allowance (typically 4-6 tons for 30-yard containers) within the quoted price. This inclusive weight makes estimating total project costs easier when debris stays within limits. However, overage fees apply when you exceed the allowance, usually charged per ton beyond the limit.
Typical overage fees in the Peoria market range from $50-100 per ton. If you fill a 30-yard container with materials totaling 8 tons when your allowance was 5 tons, expect additional charges for those 3 excess tons ($150-300). On projects where you know debris will be heavy, negotiate higher weight allowances upfront rather than paying premium overage rates later.
According to guidance from the EPA’s sustainable materials management program, contractors can reduce disposal costs by separating materials for recycling rather than sending mixed loads to landfills.
Material Separation for Cost Reduction
Separating debris by material type often reduces overall disposal costs even though it requires additional labor. Clean loads of single materials (wood, metal, concrete, drywall) qualify for lower disposal rates at recycling facilities compared to mixed construction debris headed to landfills.
For example, metal separation makes economic sense on most projects. Scrap metal from electrical work, plumbing, HVAC, and structural materials can be separated into a designated area and hauled to metal recyclers rather than occupying paid dumpster space. Many metal recyclers in the Peoria area offer free pickup for significant quantities.
Wood waste from framing projects can sometimes be separated and hauled to facilities accepting clean lumber for grinding into mulch or biomass fuel. While this requires coordination, the savings on disposal fees and reduced dumpster capacity needs can offset the extra effort on larger projects.
Timing Rentals to Project Phases
Strategic timing of dumpster deliveries matches container availability to actual debris generation, avoiding situations where you’re paying rental fees while the container sits empty or only partially full. Coordinate container delivery to coincide with demolition start dates, not project start dates when you’re still pulling permits and ordering materials.
For phased projects, schedule containers to arrive at the beginning of high-debris phases (demolition, framing, drywall) and arrange pickup when each phase completes. Using multiple smaller containers timed to project phases often costs less than one large container sitting on site for weeks.
Multi-Project Coordination
Contractors managing multiple small projects simultaneously can share container capacity across job sites to reduce per-project costs. If you’re running three bathroom renovations and one kitchen remodel across different Peoria properties during the same week, coordinating debris removal into a shared 30-yard container instead of four separate 10-15 yard containers typically saves 20-30% on disposal costs.
This strategy requires careful logistics—you need trucks or trailers to haul debris from individual job sites to a central location where the shared container sits. Calculate the labor and fuel costs against the disposal savings to verify the approach makes economic sense for your operation.
Common Mistakes Contractors Make With 30-Yard Containers
Experienced general contractors have learned these lessons the expensive way. Avoiding these common errors saves time, money, and headaches on Peoria residential construction projects.
**Loading prohibited materials:** Paint cans, chemicals, tires, batteries, propane tanks, and other hazardous materials can’t go into construction dumpsters. Contaminating a load with prohibited items results in rejection at the disposal facility and additional fees for proper disposal. Always verify accepted materials before loading.
**Overfilling past the rim:** Debris extending above the container’s top edge creates safety hazards during transport and violates hauling regulations. Drivers must reject overfilled containers or charge additional fees to remove excess materials before hauling. Budget for a second container if you’re approaching capacity rather than trying to overfill one container.
**Ignoring weight distribution:** Loading all heavy materials on one end of the container creates handling problems and potential equipment damage during pickup. Distribute weight evenly throughout the container, placing heavier items on the bottom and spreading them front-to-back to maintain balance.
**Poor placement planning:** Containers placed too close to structures, utility pedestals, or obstacles prevent safe pickup. Always maintain 5-10 feet of clearance on all sides and verify overhead clearance for the truck’s lifting arms. Repositioning fees apply when improper placement requires moving the container before pickup.
**Inadequate access maintenance:** Blocking driveway access with vehicles, equipment, or materials prevents scheduled pickups and results in trip charges when the hauler can’t access the container. Keep access routes clear and notify all subcontractors about pickup schedules.
Mini Case Studies: 30-Yard Container Applications
**Bungalow Addition (Peoria North End):** General contractor added 600-square-foot primary suite to 1940s bungalow. Used one 30-yard container for demolition phase (removing exterior wall, roofing section) and second 30-yard for framing phase waste. Total project debris: 22 cubic yards at 4.2 tons. Container choice: appropriate for scope.
**Whole-Home Interior Renovation (West Peoria):** 1,800-square-foot ranch received complete interior update including kitchen, both bathrooms, and flooring throughout. Contractor used one 40-yard container instead of 30-yard, anticipating heavy tile removal from kitchen and baths. Actual debris: 35 cubic yards at 7.8 tons. Container choice: correctly avoided 30-yard limitations.
**New Single-Family Construction (Dunlap):** 2,100-square-foot new build generated framing waste, packaging, and general construction debris over 4-month build. Contractor coordinated two 30-yard containers timed to framing phase and finish phase. Total debris: 28 cubic yards at 3.9 tons. Container choice: efficient capacity utilization.
**Deck Demolition and Rebuild (Metamora Township):** Removed 400-square-foot elevated deck and built new composite deck. Used 20-yard container, not 30-yard. Actual debris: 12 cubic yards at 2.1 tons. Container choice: avoided oversize rental for limited scope.
Need Help Sourcing the Right Dumpster for Your Peoria Construction Project?
We match general contractors with local haulers offering the right container size, weight capacity, and timing for your specific job requirements.
Get accurate quotes comparing 20, 30, and 40-yard options from trusted Peoria-area haulers
Making the Final Decision: Your 30-Yard Container Checklist
Before committing to a 30-yard container rental for your next Peoria residential construction project, verify these key factors:
**Debris volume estimate:** Calculate expected waste from demolition, framing, and finish phases. Does total volume fall between 15-28 cubic yards? If lower, consider 20-yard. If higher, evaluate 40-yard options.
**Weight calculation:** Estimate total debris weight based on material types. Does it stay within 4-6 ton range? Heavy materials like concrete, tile, or masonry require smaller containers regardless of volume.
**Project timeline:** Will debris generation occur in concentrated bursts (demolition phase) or spread over weeks? Concentrated generation favors larger containers; extended timelines may benefit from multiple smaller containers.
**Site access:** Verify 60 feet of clearance, 23-25 feet overhead clearance, and stable surface. Measure twice before ordering to avoid placement problems.
**Budget considerations:** Get quotes for 20, 30, and 40-yard options. Sometimes stepping up to 40-yard costs only $50-100 more while providing significant capacity buffer. Other times, a 20-yard container saves $100-150 when project scope doesn’t justify larger size.
**Material disposal rules:** Confirm accepted materials with your sourcing partner. Separate prohibited items and hazardous materials before loading. Contaminated loads result in rejection and additional fees.
**Neighborhood factors:** Check HOA restrictions, verify permit requirements if street placement necessary, and consider neighbor impact for extended rentals in residential areas.
General contractors who carefully evaluate these factors before ordering consistently make better container size decisions, reduce disposal costs, and avoid project delays caused by waste management problems.
Conclusion
Choosing a 30-yard dumpster for construction projects comes down to matching container capacity and weight limits to your specific project characteristics. These containers work best for mid-size residential construction generating 15-28 cubic yards of mixed, lighter debris weighing 4-6 tons total. General contractors working on framing projects, multi-room renovations, roofing tear-offs, or light demolition in Peoria neighborhoods find the 30-yard size offers optimal value.
The key to making smart container decisions lies in estimating both volume and weight before ordering, understanding when different sizes make more economic sense, and recognizing projects where 30-yard containers create problems rather than solving them. Heavy materials, single-room projects, and extended timelines often call for different approaches.
Successful waste management directly affects your profitability and reputation on residential construction projects. Taking time to right-size containers, plan delivery timing around project phases, and coordinate debris removal strategically separates profitable contractors from those constantly fighting disposal problems.
30-Yard Dumpster for Construction FAQs
How much does a 30-yard dumpster rental cost for construction projects in Peoria?
Typical 30-yard dumpster rentals in Peoria range from $500-750 for a standard 7-10 day rental period including 4-6 tons of weight allowance. Final costs vary based on debris type, haul distance from the disposal facility, current disposal fees, and rental duration. Heavy materials or extended rental periods increase total costs. Always request itemized quotes showing base rental fees, weight allowances, and potential overage charges.
What’s the difference between choosing a 20-yard versus 30-yard dumpster for residential construction?
A 20-yard container holds approximately 20 cubic yards (roughly 6-8 pickup truck loads) with typical weight limits of 3-5 tons, making it appropriate for single-room renovations or small projects. The 30-yard size holds 30 cubic yards (9-12 truck loads) with 4-6 ton capacity, fitting multi-room renovations and standard new construction projects. The physical difference in length is minimal (both typically 22 feet long), but height increases from 4.5 feet to 6 feet. Cost difference runs $100-150 more for the 30-yard size in most Peoria markets.
Can I use a 30-yard dumpster for concrete or brick removal from construction sites?
No, 30-yard containers are not appropriate for heavy materials like concrete, brick, block, or masonry. These dense materials quickly exceed weight limits—just 3 cubic yards of concrete weighs approximately 12,000 pounds, filling the entire weight capacity while using only 10% of the volume. Use 10-yard containers for heavy materials to avoid overweight fees and potential safety violations. Multiple small containers properly managed cost less than overweight fees on one large container.
How long can I keep a 30-yard dumpster on my Peoria construction site?
Standard rental periods run 7-10 days, with daily or weekly rates available for extended needs. On private property (driveways, job sites), length is negotiable with the hauler. For street placement requiring City of Peoria permits, the initial permit costs $20 for up to 30 days. Extended rentals in residential areas may generate neighborhood complaints or HOA violations, particularly when containers sit partially full for weeks. Most contractors find 7-14 day rentals sufficient for concentrated demolition or framing phases.
What construction materials cannot go into a 30-yard dumpster?
Prohibited items include paint cans (even empty), chemicals, solvents, automotive fluids, tires, batteries, propane tanks, electronics containing refrigerants, asbestos materials, and anything classified as hazardous waste. Most haulers also restrict items like mattresses, appliances with refrigerants, and certain electronics due to special disposal requirements. Contaminating a load with prohibited materials results in rejection fees and additional charges for proper disposal. Always verify accepted materials with your waste sourcing partner before loading to avoid costly problems.
30-Yard Dumpster for Construction Citations
[1] Dumpsters.com. “30 Yard Dumpster Rental.” Retrieved from https://www.dumpsters.com/sizes/30-yard-dumpster
[2] Raps Roll-offs. “How Big Is a 30-Yard Dumpster?” February 4, 2025. Retrieved from https://www.rapsrolloffs.com/blog/how-big-is-a-30-yard-dumpster
[3] Hometown Dumpster Rental. “Guide to Dumpster Weight Limits.” Retrieved from https://www.hometowndumpsterrental.com/blog/guide-to-dumpster-weight-limits
[4] Zap Dumpsters Peoria. “Do I Need a Dumpster Permit in Peoria?” Retrieved from https://zapdumpsterspeoria.com/how-to-get-a-dumpster-permit-in-peoria-il-2/
[5] Budget Dumpster. “What Is the Weight Limit of a Roll Off Dumpster?” October 17, 2024. Retrieved from https://www.budgetdumpster.com/budget-dumpster-sizes/weight-limits.php
[6] Arcann Waste. “How Much Does a Garbage Dumpster Weight?” January 31, 2025. Retrieved from https://blog.arcannwaste.com/how-much-does-a-garbage-dumpster-weight/
